字典APP>英语词典>dam up翻译和用法

dam up

英 [dæm ʌp]

美 [dæm ʌp]

壅高;筑坝壅水;挡水

英英释义

verb

  • obstruct with, or as if with, a dam
    1. dam the gorges of the Yangtse River
    Synonym:dam

双语例句

  • The concrete seepage place of water conservancy engineering seepage is difficult to determine. We use the throwing salt method analyze the dam seepage and put up the evidence to engineering design of danger control.
    水利工程渗漏一般较难准确确定具体渗漏部位.用投盐法分析大坝渗漏,可为工程除险加固设计提供依据。
  • The impermeability of the concrete has been greatly improved and leakage of the dam body is decreased up to 1. 88 m3/ h, thus meeting the design requirement.
    堰顶横缝表面封堵和混凝土裂缝的化学灌浆处理,增强了混凝土的防渗性能,坝体渗漏量降为1.88m3/h,满足了设计要求。
  • The problem of uplift pressure being higher in non-overflow sections at the right bank of Shiquan dam has come up since the first dam safety inspection, a lot of studies and work have been done but got lower effect.
    石泉大坝右岸非溢流坝段扬压力超标问题自第一次安全定期检查提出后,曾做过大量的加固研究工作,但效果一直不明显。
  • After the two solutions, in down dam selection it is also under the same technical and economic comparison of the dam with the up dam, finally the concrete arch dams is selected.
    在选定这两个方案后也是通过和在上坝址选择过程一样的方法对下坝址进行了技术经济比较,最终选定下坝址以混凝土拱坝为代表坝型。
  • A commission report said the dam could lose up to60 percent of its operating capacity in30 years, though, because of sediment building up in the reservoir.
    但是湄公河委员会的一份报告说,由于水库泥沙堆积,沙耶武里水电站有可能在30年的时间里失去60%的发电能力。
  • The major contents are as follows: ( 1) According to the conservation of energy theory and the heat transfer theory, the heat transfer model of dam leakage is set up through the combination with the conservation energy equation and the heat transfer equation.
    根据能量守恒原理、传热学理论,由能量平衡方程及热传导方程联合建立大坝渗漏传热模型。
  • Jack is not such a man as can dam up his feeling.
    杰克不是能控制感情的人。
  • On the basis of the technique of system simulation and the theory of queue stochastic simulation network, the queue network simulation model and the construction process simulation model for high roller compacted concret dam have been set up.
    本文根据碾压混凝土坝施工特点,采用计算机系统仿真技术和排队随机仿真网格理论,建立了高碾压混凝土坝施工交通运输系统排队网络仿真模型和高碾压坝施工浇筑过程仿真模型。
  • The basic conditions, which the dam system can come up to relative stability, are as follow.
    坝系要达到相对稳定,最基本的条件有3个:一是相对稳定系数必须大于或等于一定的允许值,这是坝系要达到相对稳定的关键;
  • Along with the development of the West Regions, West-East electricity transmission project, South-to-North Water Transfer project are under way, there are more and more constructions of high dam and giant reservoir coming up.
    随着西部大开发、西电东送以及南水北调等国家级大工程项目的开工建设,高坝大库的建设越来越多。